No one logged in. Log in
Orana Engineering Townsville

PROJECT SEARCH




Onsite Accommodation As-Built Drawings

Following construction and commissioning of the Onsite Accommodation Camp at Oaky Creek Coal Mine located in Central Queensland, Orana Engineering was provided with “As-Built” mark-ups to the complete set of construction drawings for the Water Storage Facility, HV Substation, Water Treatment Plant tie-ins and supply pipeline.  These drawing mark-ups largely confirmed that construction was in accordance with the civil, electrical and mechanical design developed by Orana Engineering, with only minor changes implemented during the construction and commissioning process (confirmation of “green” pipe spool lengths, etc.).

Using the provided “As-Built” mark-ups, Orana Engineering was able to use AutoCAD to revise the drawing set to “As-Built” status.  An “As-Built” drawing set provides an accurate up to date reflection of the installation for use in ongoing site operations in maintenance.  This drawing revision also allows Orana Engineering to perform an engineering review of any changes that were required to complete the construction and commissioning process, and due to Orana Engineering’s rigorous quality assurance process, means that these drawings receive RPEQ verification.

Once the “As-Built” drawing set was completed, Orana Engineering utilised the relevant document control process to ensure that the drawings were uploaded to the client document management system, allowing all site personal access to the “As-Built” drawing set.  By Orana Engineering performing drawing management for our clients, we are able to assist them with their regulatory obligations with respect to providing up to date information to all mine workers.

If you would like any more information or details about Orana Engineering’s drawing revision capabilities, please do not hesitate to contact us or review our capabilities.