Structural Engineering Consultants

Structural engineering deals with the design, construction, maintenance and assessment of permanent and temporary structures or structural systems.  Structures are designed to work within their environment and accommodate relevant external forces such as wind, waves, earthquakes, etc.  Structural engineers work closely with Orana Engineering’s other engineering disciplines such as mechanical and electrical to provide a complete design solution for our clients.

Orana Engineering can provide a range of structural engineering services including assessments and design of:

  • Foundations;
  • Access platforms;
  • Services (e.g. pipework, cable ladder, etc) supporting structures;
  • Monorails; and
  • Structural inspections and audits.

We service coal, metalliferous, oil and gas clients as well as industrial and commercial clients. Explore the case studies below for more information on structural engineering services by Orana Engineering.

Orana Engineering Structural Engineering

Building Certification

Monadelphous Group Limited was contracted to deliver the Talinga Pipeline Compression Facility (PCF) for Origin Energy’s Australia Pacific Liquefied Natural Gas (APLNG) project.

Read more
Building Certification

Ball Mill No. 2 Recommissioning

FMR Investment's Eloise Copper Mine had a requirement to recommission their No.2 Ball Mill.  During the process of the recommissioning works it was identified that a means to relocate the grinding media to the feed chute needed to be designed and engineered with RPEQ certification.

Read more
Ball Mill No. 2 Recommissioning

Crusher Circuit Upgrade

Eloise Copper Mine purchased a Metso dual deck vibrating screen to replace an existing smaller screen and a second Omnicone cone crusher to provide a secondary crushing circuit for increased production and efficiency. Orana Engineering was engaged to develop a design solution and detailed drawings for the secondary crushing circuit which utilised as much existing equipment as possible. Orana Engineering was able to provide an efficient, practical design solution while minimising the associated design costs to provide site personnel with information required to refurbish and install the conveyor equipment necessary for the crushing circuit. Orana Engineering successfully completed the design within a tight project time frame and produced in excess of 100 detailed drawings.

Read more
Crusher Circuit Upgrade

Cyanide Tank Upgrade

Carpentaria Gold identified that bunding around their Ravenswood cyanide storage tank was inadequate. Sodium Cyanide, used in the gold recovery process, is potentially lethal to humans and animals and detrimental to the environment. It is necessary to ensure it can be safely contained in an emergency. Orana Engineering provided an innovative solution comprising a smaller tank fitted inside the existing tank. The design minimised loss of storage capacity by providing a smaller tank for primary storage whilst maintaining the existing external tank to act as the bund. Utilising the existing tank as a bund, Orana Engineering delivered a design that met the client brief while re-using the majority of major tie-in points and providing improved access for maintenance.

Read more
Cyanide Tank Upgrade

FB-028 Tank Lifting Beam

During an upgrade to the Concentrator at MMG’s Century Mine located in Western Queensland, Orana Engineering was engaged to design a lifting beam for the installation of a new flotation cell.

Read more
FB-028 Tank Lifting Beam

Flotation Cell Upgrade

To increase the efficiency of their concentrator, Eloise Copper Mine enlisted Orana Engineering to provide engineering and design assistance with installation of three copper concentrate scavenger cells within the existing plant. 3D models created by Orana Engineering designers were used to visually communicate solutions for new and existing equipment locations and structure arrangements. Detailing of these concept models enabled Orana Engineering to identify key tie-in locations within the plant for survey during the detailed design phase. A multidisciplinary approach during detailed design ensured improved efficiency, with brownfield engineering challenges in relocating / connecting to existing equipment successfully achieved. Upon design completion the client was provided with an installation drawing set and scope of work.

Read more
Flotation Cell Upgrade

Gold Slurry Sampler

Orana Engineering was engaged to design new sampling equipment for improved sampling effectiveness at Carpentaria Gold’s Ravenswood operations. A site visit was undertaken by Orana Engineering design staff to accurately record critical data. This enabled designers to produce a detailed 3D model which was used extensively during interactions with the client and ensured a fluent understanding of the project scope by both parties throughout the design process. Orana Engineering was able to integrate new sampling equipment into the existing plant whilst minimising any impact on the operation. Various challenges were overcome with the result being successful delivery of drawings for fabrication and installation of equipment, allowing improved sampling and production reconciliation whilst minimising impact to operations.

Read more
Gold Slurry Sampler

Heavy Vehicle Washdown Facility

MMG's Karumba Port Facility engaged Orana Engineering to design a heavy vehicle washdown facility to assist with management of concentrate for site vehicles and machinery. The time frame was short due to operational requirements, such that Orana Engineering worked from concept to IFC drawings in just seven days. The design needed to accommodate a number of different vehicles from fully laden container trailers to a 30 tonne forklift, whilst also ensuring ease of facility maintenance and capture of runoff for environmental compliance. Concept sketches were prepared, from which a detailed design was developed to meet client requirements. Through effective communication with the client Orana Engineering was able to deliver the design in a compressed timeline, to specification and budget.

Read more
Heavy Vehicle Washdown Facility

Inner Bypass Valves

Orana Engineering was engaged by MMG's Century Mine to design an upgrade within the concentrator for increased flow from a flotation cell to a tailings trough. Orana Engineering conducted a concept investigation of available options to increase the flow rate. Results were presented for a range of design and operating conditions, and a preferred option was selected for detailed design. Orana Engineering design staff created a 3D model of the new pipeline using Autodesk Inventor. The 3D model was used to produce fabrication drawings for pipe supports, new platform and new pipe bridge. Drawings also included isometric pipe spool drawings and revised P&ID drawings.

Read more
Inner Bypass Valves

Jaw Crusher Platform

FMR Investment's Eloise Copper Mine is an underground mining operation producing copper concentrate for export.  The maintenance department of Eloise Copper Mine contacted Orana Engineering with a specific requirement for the design of an access platform for their jaw crusher including engineering certification and drafting.  The client provided Orana Engineering with site measurements and a basic concept of the design they were looking for.

Read more
Jaw Crusher Platform